The system of record for crane companies

Every machine. Every hour. Every dollar.

Dispatch, field tickets, daily reporting, safety documentation, equipment inspections and billing — one live system. From the field crew to the corner office: the data, the control and the technology the crane industry has never had in one place.

Command Center · 06:00 SAMPLE TENANT
Fleet utilization
0%
vs. 76% last week
Revenue / machine-day
$0
+9% month to date
Ticket → invoice
0days
was 9 days on paper
Unbilled field work
$0
1 ticket awaiting hours
LIVE BOARD · WED6 MACHINES
AC-550Prairie Rim — WTG 031 main bearingWIND WED
AC-600Salt Fork II — generator exchangeON PLAN
AC-275Meridian DC-4 — tandem chiller setTANDEM
!Weather alert — Wed gusts 17 m/s at Prairie Rim, over the 12 m/s cutoff in the lift plan.Review
Needs you today · 3
Rain hold — 2 crews moved to standby rateauto
LR 1300 annual inspection due9 days
Harbor Point quote — no reply, day 3$86k
Running today at Power Crane — alongside the fleet that built it.
whiteboardTeams chatsgroup texts paper ticketsload listsspreadsheets voicemailcert binder →one system of record
Where it all lands

Every stream of the operation. One record.

Operations dataOne system of record
The owner's screen — executive metrics in the palm of your hand

You shouldn’t have to call three people or host a Teams meeting to know how yesterday went.

Utilization, revenue per machine, what's idle, what's expiring, what's unsigned — the whole operation on one page, current to the minute. Click through the tabs.

Sample Crane Co. · Operations
SAMPLE TENANT
Machines working
0/ 14
3 available today
Hours logged yesterday
0
all signed in field
Billed same day
0%
11 of 12 tickets → invoiced
Margin, month to date
0%
+4 pts vs. last month
Fleet utilization · trailing 12 weeks WEEKLY AVG · ALL MACHINES
Fleet · utilization this week14 machines
LTM 1750-9.1900T88%
LR 1600/2600T91%
LR 1300300T84%
LTM 1200-5.1200T76%
LTM 1090-4.2100T72%
LTM 1500-8.1500T38%
Costing you money right nowlive
!500T sitting four daysNo job assigned since Thursday
!Cert expires in 11 daysBlocks two scheduled picks
$$14.2k change order unsignedJuniper BESS · 6 days out
!1 ticket awaiting hoursTK-2412 · flagged to the foreman

Illustrative ACOMP operating view using fictional sample data. See it with your fleet →

Running their operation on ACOMP
Power Crane Destructable
One job, quote to invoice

The pick and the paperwork end at the same time.

Quote accepted
Aug 22
Crane, crew and rates locked to the job before a wheel turns.
Mobilization
Aug 25
Crane moves to the project. Loads and permits ride on the same job record.
Day one
Aug 26
10 crane hours. 3 non-billable hours logged as non-billable — not lost, not argued.
Crew added
Aug 27
2 riggers added on site. Priced against the job the moment they sign in.
Demobilization
Aug 27
10 more crane hours, then the crane comes off site. The job closes itself out.
Invoice
Aug 27
Every hour, rigger and move already on it. Nobody re-typed anything.
One record from the quote to the invoice — not nine days of chasing paper after the crane leaves.
Every day you shave off getting paid compounds — and it is the number your lender looks at.
The platform

Six systems, built to work as one.

Not modules bolted together. One record a job moves through, from quote to cash.

01Jobs & DispatchCrane, crew and job assigned in one place — the board the yard and the office both read.
02Daily ReportsHours logged from the field on a phone. Visible in the office the same day, not the same week.
03Safety Forms & Daily Inspection Sign-OffsJHAs and toolbox talks tied to the job — and required before a ticket can open, if that's your rule.
04Field Tickets & InvoicingSigned in the field, priced against your billing codes, invoiced without a second keystroke — ready for your bookkeeper, not a shoebox of paper at month-end.
05Equipment & CertificationsEvery machine and every operator card tracked on a schedule — expiring on a calendar, not on memory.
06Your Company, Your System, Your FutureYour name, your logo, your data. A private instance — not a login on somebody else’s platform.
Crawler crane erecting a wind turbine on an Apex Crane job
From the founder

“I didn’t build ACOMP after stepping away from the crane industry. I built it while running a crane division, because the systems we had could not keep pace with the way the work actually moved. I needed one operating picture I could trust: data we could act on, structure the company could grow around, and technology that improved with every job. I wanted the field, operations, payroll, billing, and leadership working from the same facts instead of debating different versions of the truth. ACOMP is the platform I needed then, built from inside the work to serve the crane industry worldwide.”

AFAulton FiegelFounder of ACOMP

Legacy crane software was built for the nineties.
ACOMP is built for what’s next.

Book a demo

Three questions, then we’ll schedule a demo designed around your crane company.

No generic product tour. We build the walkthrough around the work you actually run.

1 · What do you run?

Pick every type in your fleet.

All terrain
Tower crane
Crawler crane
All of the above

2 · How many machines in your fleet?

1–3
4–10
11–25
25+

3 · Who are we building it for?

Setup is done with you, not dumped on you — ACOMP was built to bring your machines, crews and billing codes across seamlessly, before you ever log in.

or contact ACOMP directly →
Direct email hello@tryacomp.com If your mail app does not open, copy the address above.